Construction Industry Survey (23/49)
1 tablas y 120 partidas de la encuesta KOSIS «Construction Industry Survey», en cifras y gráficos anuales.
공사지역/공사종류별 계약액,기성액,원도급 및 하도급공사 기성액
Volver arriba공사지역별 전체 · 공사종류별 총계
- Value of orders received in original contract
- Building construction Value of orders received in original contract
- Detached & tenement house Value of orders received in original contract
- Apartment Value of orders received in original contract
- Residential shop Value of orders received in original contract
- Market department store Value of orders received in original contract
- Business building Value of orders received in original contract
- Public building Value of orders received in original contract
- Hotel & lodgings Value of orders received in original contract
- Educational facilities Value of orders received in original contract
- Hospital Value of orders received in original contract
- Church & temple Value of orders received in original contract
- Traditional style & Cultural building Value of orders received in original contract
- Public & Performance Value of orders received in original contract
- Stadium & playground Value of orders received in original contract
- Exhibition pavilion Value of orders received in original contract
- Factory & workshop Value of orders received in original contract
- Machine installation (except plant) Value of orders received in original contract
- Substation power plant Value of orders received in original contract
- Warehouse garage terminal building Value of orders received in original contract
- Hazardous property storehouse Value of orders received in original contract
- Other Building Facilities Value of orders received in original contract
- Civil engineering Value of orders received in original contract
- General road Value of orders received in original contract
- Value of construction completed
- Building construction Value of construction completed
- Detached & tenement house Value of construction completed
- Apartment Value of construction completed
- Residential shop Value of construction completed
- Market department store Value of construction completed
- Business building Value of construction completed
- Public building Value of construction completed
- Hotel & lodgings Value of construction completed
- Educational facilities Value of construction completed
- Hospital Value of construction completed
- Church & temple Value of construction completed
- Traditional style & Cultural building Value of construction completed
- Public & Performance Value of construction completed
- Stadium & playground Value of construction completed
- Exhibition pavilion Value of construction completed
- Factory & workshop Value of construction completed
- Machine installation (except plant) Value of construction completed
- Substation power plant Value of construction completed
- Warehouse garage terminal building Value of construction completed
- Hazardous property storehouse Value of construction completed
- Other Building Facilities Value of construction completed
- Civil engineering Value of construction completed
- General road Value of construction completed
- Value of construction completed in original contract
- Building construction Value of construction completed in original contract
- Detached & tenement house Value of construction completed in original contract
- Apartment Value of construction completed in original contract
- Residential shop Value of construction completed in original contract
- Market department store Value of construction completed in original contract
- Business building Value of construction completed in original contract
- Public building Value of construction completed in original contract
- Hotel & lodgings Value of construction completed in original contract
- Educational facilities Value of construction completed in original contract
- Hospital Value of construction completed in original contract
- Church & temple Value of construction completed in original contract
- Traditional style & Cultural building Value of construction completed in original contract
- Public & Performance Value of construction completed in original contract
- Stadium & playground Value of construction completed in original contract
- Exhibition pavilion Value of construction completed in original contract
- Factory & workshop Value of construction completed in original contract
- Machine installation (except plant) Value of construction completed in original contract
- Substation power plant Value of construction completed in original contract
- Warehouse garage terminal building Value of construction completed in original contract
- Hazardous property storehouse Value of construction completed in original contract
- Other Building Facilities Value of construction completed in original contract
- Civil engineering Value of construction completed in original contract
- General road Value of construction completed in original contract
- Value of construction completed in subcontract
- Building construction Value of construction completed in subcontract
- Detached & tenement house Value of construction completed in subcontract
- Apartment Value of construction completed in subcontract
- Residential shop Value of construction completed in subcontract
- Market department store Value of construction completed in subcontract
- Business building Value of construction completed in subcontract
- Public building Value of construction completed in subcontract
- Hotel & lodgings Value of construction completed in subcontract
- Educational facilities Value of construction completed in subcontract
- Hospital Value of construction completed in subcontract
- Church & temple Value of construction completed in subcontract
- Traditional style & Cultural building Value of construction completed in subcontract
- Public & Performance Value of construction completed in subcontract
- Stadium & playground Value of construction completed in subcontract
- Exhibition pavilion Value of construction completed in subcontract
- Factory & workshop Value of construction completed in subcontract
- Machine installation (except plant) Value of construction completed in subcontract
- Substation power plant Value of construction completed in subcontract
- Warehouse garage terminal building Value of construction completed in subcontract
- Hazardous property storehouse Value of construction completed in subcontract
- Other Building Facilities Value of construction completed in subcontract
- Civil engineering Value of construction completed in subcontract
- General road Value of construction completed in subcontract
- Value of carry-over work
- Building construction Value of carry-over work
- Detached & tenement house Value of carry-over work
- Apartment Value of carry-over work
- Residential shop Value of carry-over work
- Market department store Value of carry-over work
- Business building Value of carry-over work
- Public building Value of carry-over work
- Hotel & lodgings Value of carry-over work
- Educational facilities Value of carry-over work
- Hospital Value of carry-over work
- Church & temple Value of carry-over work
- Traditional style & Cultural building Value of carry-over work
- Public & Performance Value of carry-over work
- Stadium & playground Value of carry-over work
- Exhibition pavilion Value of carry-over work
- Factory & workshop Value of carry-over work
- Machine installation (except plant) Value of carry-over work
- Substation power plant Value of carry-over work
- Warehouse garage terminal building Value of carry-over work
- Hazardous property storehouse Value of carry-over work
- Other Building Facilities Value of carry-over work
- Civil engineering Value of carry-over work
- General road Value of carry-over work
Value of orders received in original contract
2013 241,983,308Mill. Won→2023 297,517,147Mill. Won▲ +22.9%
Building construction Value of orders received in original contract
2013 124,654,476Mill. Won→2023 174,099,903Mill. Won▲ +39.7%
Detached & tenement house Value of orders received in original contract
2013 4,434,164Mill. Won→2023 8,726,655Mill. Won▲ +96.8%
Apartment Value of orders received in original contract
2013 36,545,175Mill. Won→2023 52,872,302Mill. Won▲ +44.7%
Residential shop Value of orders received in original contract
2013 6,931,337Mill. Won→2023 9,078,621Mill. Won▲ +31.0%
Market department store Value of orders received in original contract
2013 7,193,965Mill. Won→2023 5,178,811Mill. Won▼ −28.0%
Business building Value of orders received in original contract
2013 13,353,344Mill. Won→2023 21,844,734Mill. Won▲ +63.6%
Public building Value of orders received in original contract
2013 6,876,036Mill. Won→2023 6,925,217Mill. Won▲ +0.7%
Hotel & lodgings Value of orders received in original contract
2013 3,482,720Mill. Won→2023 4,057,241Mill. Won▲ +16.5%
Educational facilities Value of orders received in original contract
2013 6,953,003Mill. Won→2023 10,822,183Mill. Won▲ +55.6%
Hospital Value of orders received in original contract
2013 2,050,408Mill. Won→2023 2,221,417Mill. Won▲ +8.3%
Church & temple Value of orders received in original contract
2013 1,706,561Mill. Won→2023 1,167,189Mill. Won▼ −31.6%
Traditional style & Cultural building Value of orders received in original contract
2013 111,083Mill. Won→2023 105,653Mill. Won▼ −4.9%
Public & Performance Value of orders received in original contract
2013 732,944Mill. Won→2023 594,233Mill. Won▼ −18.9%
Stadium & playground Value of orders received in original contract
2013 1,274,776Mill. Won→2023 1,084,455Mill. Won▼ −14.9%
Exhibition pavilion Value of orders received in original contract
2013 1,302,444Mill. Won→2023 735,288Mill. Won▼ −43.5%
Factory & workshop Value of orders received in original contract
2013 19,472,049Mill. Won→2023 31,676,537Mill. Won▲ +62.7%
Machine installation (except plant) Value of orders received in original contract
2013 108,162Mill. Won→2023 347,442Mill. Won▲ +221.2%
Substation power plant Value of orders received in original contract
2013 1,363,888Mill. Won→2023 329,284Mill. Won▼ −75.9%
Warehouse garage terminal building Value of orders received in original contract
2013 4,085,864Mill. Won→2023 5,882,509Mill. Won▲ +44.0%
Hazardous property storehouse Value of orders received in original contract
2013 216,693Mill. Won→2023 246,701Mill. Won▲ +13.8%
Other Building Facilities Value of orders received in original contract
2013 6,459,849Mill. Won→2023 10,203,431Mill. Won▲ +58.0%
Civil engineering Value of orders received in original contract
2013 55,945,431Mill. Won→2023 52,973,943Mill. Won▼ −5.3%
General road Value of orders received in original contract
2013 7,446,924Mill. Won→2023 8,132,734Mill. Won▲ +9.2%
Value of construction completed
2008 211,555,501Million Won→2023 359,180,313Million Won▲ +69.8%
Building construction Value of construction completed
2008 114,631,733Million Won→2023 252,602,425Million Won▲ +120.4%
Detached & tenement house Value of construction completed
2008 1,743,318Million Won→2023 6,610,583Million Won▲ +279.2%
Apartment Value of construction completed
2008 43,274,965Million Won→2023 82,861,648Million Won▲ +91.5%
Residential shop Value of construction completed
2008 4,989,515Million Won→2023 17,764,612Million Won▲ +256.0%
Market department store Value of construction completed
2008 5,411,710Million Won→2023 5,965,471Million Won▲ +10.2%
Business building Value of construction completed
2008 7,583,872Million Won→2023 32,329,653Million Won▲ +326.3%
Public building Value of construction completed
2008 3,852,131Million Won→2023 8,107,984Million Won▲ +110.5%
Hotel & lodgings Value of construction completed
2008 3,177,521Million Won→2023 6,656,737Million Won▲ +109.5%
Educational facilities Value of construction completed
2008 7,391,690Million Won→2023 9,567,415Million Won▲ +29.4%
Hospital Value of construction completed
2008 2,109,255Million Won→2023 3,060,676Million Won▲ +45.1%
Church & temple Value of construction completed
2008 1,066,960Million Won→2023 1,338,928Million Won▲ +25.5%
Traditional style & Cultural building Value of construction completed
2008 132,389Million Won→2023 74,073Million Won▼ −44.0%
Public & Performance Value of construction completed
2008 684,679Million Won→2023 672,969Million Won▼ −1.7%
Stadium & playground Value of construction completed
2008 1,040,378Million Won→2023 1,712,381Million Won▲ +64.6%
Exhibition pavilion Value of construction completed
2008 1,045,906Million Won→2023 784,438Million Won▼ −25.0%
Factory & workshop Value of construction completed
2008 15,053,892Million Won→2023 48,940,441Million Won▲ +225.1%
Machine installation (except plant) Value of construction completed
2008 1,102,162Million Won→2023 613,174Million Won▼ −44.4%
Substation power plant Value of construction completed
2008 1,277,190Million Won→2023 601,686Million Won▼ −52.9%
Warehouse garage terminal building Value of construction completed
2008 2,256,155Million Won→2023 15,309,199Million Won▲ +578.6%
Hazardous property storehouse Value of construction completed
2008 219,728Million Won→2023 276,813Million Won▲ +26.0%
Other Building Facilities Value of construction completed
2008 11,218,307Million Won→2023 9,353,545Million Won▼ −16.6%
Civil engineering Value of construction completed
2008 59,429,142Million Won→2023 50,697,940Million Won▼ −14.7%
General road Value of construction completed
2008 8,247,953Million Won→2023 7,373,668Million Won▼ −10.6%
Value of construction completed in original contract
2008 145,571,069Million Won→2023 235,503,936Million Won▲ +61.8%
Building construction Value of construction completed in original contract
2008 75,780,877Million Won→2023 157,027,051Million Won▲ +107.2%
Detached & tenement house Value of construction completed in original contract
2008 1,324,610Million Won→2023 4,652,156Million Won▲ +251.2%
Apartment Value of construction completed in original contract
2008 27,790,189Million Won→2023 45,879,898Million Won▲ +65.1%
Residential shop Value of construction completed in original contract
2008 3,440,421Million Won→2023 10,840,786Million Won▲ +215.1%
Market department store Value of construction completed in original contract
2008 3,901,676Million Won→2023 4,243,702Million Won▲ +8.8%
Business building Value of construction completed in original contract
2008 5,350,693Million Won→2023 18,555,353Million Won▲ +246.8%
Public building Value of construction completed in original contract
2008 2,584,479Million Won→2023 5,735,047Million Won▲ +121.9%
Hotel & lodgings Value of construction completed in original contract
2008 2,247,182Million Won→2023 3,760,501Million Won▲ +67.3%
Educational facilities Value of construction completed in original contract
2008 4,606,299Million Won→2023 7,384,934Million Won▲ +60.3%
Hospital Value of construction completed in original contract
2008 1,304,144Million Won→2023 2,046,652Million Won▲ +56.9%
Church & temple Value of construction completed in original contract
2008 654,611Million Won→2023 804,318Million Won▲ +22.9%
Traditional style & Cultural building Value of construction completed in original contract
2008 91,190Million Won→2023 61,264Million Won▼ −32.8%
Public & Performance Value of construction completed in original contract
2008 451,257Million Won→2023 478,099Million Won▲ +5.9%
Stadium & playground Value of construction completed in original contract
2008 565,458Million Won→2023 1,169,989Million Won▲ +106.9%
Exhibition pavilion Value of construction completed in original contract
2008 783,343Million Won→2023 544,738Million Won▼ −30.5%
Factory & workshop Value of construction completed in original contract
2008 9,983,085Million Won→2023 34,125,508Million Won▲ +241.8%
Machine installation (except plant) Value of construction completed in original contract
2008 775,965Million Won→2023 332,434Million Won▼ −57.2%
Substation power plant Value of construction completed in original contract
2008 970,256Million Won→2023 401,744Million Won▼ −58.6%
Warehouse garage terminal building Value of construction completed in original contract
2008 1,546,313Million Won→2023 8,516,027Million Won▲ +450.7%
Hazardous property storehouse Value of construction completed in original contract
2008 168,077Million Won→2023 188,922Million Won▲ +12.4%
Other Building Facilities Value of construction completed in original contract
2008 7,241,617Million Won→2023 7,304,977Million Won▲ +0.9%
Civil engineering Value of construction completed in original contract
2008 39,253,817Million Won→2023 36,204,238Million Won▼ −7.8%
General road Value of construction completed in original contract
2008 5,440,168Million Won→2023 5,804,393Million Won▲ +6.7%
Value of construction completed in subcontract
2008 65,984,431Million Won→2023 123,676,377Million Won▲ +87.4%
Building construction Value of construction completed in subcontract
2008 38,850,855Million Won→2023 95,575,375Million Won▲ +146.0%
Detached & tenement house Value of construction completed in subcontract
2008 418,707Million Won→2023 1,958,427Million Won▲ +367.7%
Apartment Value of construction completed in subcontract
2008 15,484,775Million Won→2023 36,981,749Million Won▲ +138.8%
Residential shop Value of construction completed in subcontract
2008 1,549,094Million Won→2023 6,923,826Million Won▲ +347.0%
Market department store Value of construction completed in subcontract
2008 1,510,034Million Won→2023 1,721,769Million Won▲ +14.0%
Business building Value of construction completed in subcontract
2008 2,233,179Million Won→2023 13,774,300Million Won▲ +516.8%
Public building Value of construction completed in subcontract
2008 1,267,652Million Won→2023 2,372,938Million Won▲ +87.2%
Hotel & lodgings Value of construction completed in subcontract
2008 930,338Million Won→2023 2,896,236Million Won▲ +211.3%
Educational facilities Value of construction completed in subcontract
2008 2,785,390Million Won→2023 2,182,480Million Won▼ −21.6%
Hospital Value of construction completed in subcontract
2008 805,111Million Won→2023 1,014,025Million Won▲ +25.9%
Church & temple Value of construction completed in subcontract
2008 412,348Million Won→2023 534,611Million Won▲ +29.7%
Traditional style & Cultural building Value of construction completed in subcontract
2008 41,198Million Won→2023 12,809Million Won▼ −68.9%
Public & Performance Value of construction completed in subcontract
2008 233,421Million Won→2023 194,870Million Won▼ −16.5%
Stadium & playground Value of construction completed in subcontract
2008 474,920Million Won→2023 542,392Million Won▲ +14.2%
Exhibition pavilion Value of construction completed in subcontract
2008 262,562Million Won→2023 239,700Million Won▼ −8.7%
Factory & workshop Value of construction completed in subcontract
2008 5,070,807Million Won→2023 14,814,932Million Won▲ +192.2%
Machine installation (except plant) Value of construction completed in subcontract
2008 326,196Million Won→2023 280,740Million Won▼ −13.9%
Substation power plant Value of construction completed in subcontract
2008 306,933Million Won→2023 199,942Million Won▼ −34.9%
Warehouse garage terminal building Value of construction completed in subcontract
2008 709,841Million Won→2023 6,793,171Million Won▲ +857.0%
Hazardous property storehouse Value of construction completed in subcontract
2008 51,651Million Won→2023 87,891Million Won▲ +70.2%
Other Building Facilities Value of construction completed in subcontract
2008 3,976,689Million Won→2023 2,048,568Million Won▼ −48.5%
Civil engineering Value of construction completed in subcontract
2008 20,175,325Million Won→2023 14,493,702Million Won▼ −28.2%
General road Value of construction completed in subcontract
2008 2,807,785Million Won→2023 1,569,274Million Won▼ −44.1%
Value of carry-over work
2008 356,583,238Million Won→2023 779,614,693Million Won▲ +118.6%
Building construction Value of carry-over work
2008 176,924,504Million Won→2023 539,547,459Million Won▲ +205.0%
Detached & tenement house Value of carry-over work
2008 2,012,071Million Won→2023 9,054,363Million Won▲ +350.0%
Apartment Value of carry-over work
2008 96,537,596Million Won→2023 327,939,253Million Won▲ +239.7%
Residential shop Value of carry-over work
2008 14,223,684Million Won→2023 36,743,816Million Won▲ +158.3%
Market department store Value of carry-over work
2008 5,773,604Million Won→2023 4,570,828Million Won▼ −20.8%
Business building Value of carry-over work
2008 10,917,456Million Won→2023 52,015,577Million Won▲ +376.4%
Public building Value of carry-over work
2008 2,348,236Million Won→2023 6,446,797Million Won▲ +174.5%
Hotel & lodgings Value of carry-over work
2008 5,798,116Million Won→2023 12,579,528Million Won▲ +117.0%
Educational facilities Value of carry-over work
2008 5,228,137Million Won→2023 7,283,474Million Won▲ +39.3%
Hospital Value of carry-over work
2008 2,462,834Million Won→2023 3,820,452Million Won▲ +55.1%
Church & temple Value of carry-over work
2008 1,154,788Million Won→2023 1,337,416Million Won▲ +15.8%
Traditional style & Cultural building Value of carry-over work
2008 110,674Million Won→2023 89,440Million Won▼ −19.2%
Public & Performance Value of carry-over work
2008 810,629Million Won→2023 1,002,568Million Won▲ +23.7%
Stadium & playground Value of carry-over work
2008 1,000,090Million Won→2023 1,417,316Million Won▲ +41.7%
Exhibition pavilion Value of carry-over work
2008 973,910Million Won→2023 561,135Million Won▼ −42.4%
Factory & workshop Value of carry-over work
2008 7,583,156Million Won→2023 48,941,592Million Won▲ +545.4%
Machine installation (except plant) Value of carry-over work
2008 3,031,181Million Won→2023 320,341Million Won▼ −89.4%
Substation power plant Value of carry-over work
2008 2,857,263Million Won→2023 662,257Million Won▼ −76.8%
Warehouse garage terminal building Value of carry-over work
2008 2,987,296Million Won→2023 16,547,931Million Won▲ +453.9%
Hazardous property storehouse Value of carry-over work
2008 64,857Million Won→2023 167,391Million Won▲ +158.1%
Other Building Facilities Value of carry-over work
2008 11,048,916Million Won→2023 8,045,985Million Won▼ −27.2%
Civil engineering Value of carry-over work
2008 104,990,998Million Won→2023 102,449,620Million Won▼ −2.4%
General road Value of carry-over work
2008 17,059,312Million Won→2023 9,141,164Million Won▼ −46.4%
Qué es esta estadística
Construction Industry Survey· - 건설업체 → 건설관련기관(6개) → 국가데이터처
- Términos clave
- Para qué se elabora
- 우리나라 건설업부문의 구조 및 산업활동 실태를 파악하여 정책수립에 필요한 기초자료 제공 활용분야 : 건설관련 정책수립, GDP.산업연관표 및 GRDP작성, 월간조사 모집단 자료로 활용
- Qué se investiga
- 기업체
원재료비 : 공사시공을 위하여 실제로 투입(사용)된 원재료의 구입 가격에 운임을 포함한 금액원도급업체가 다른 업체와 하도급 계약을 맺을 경우의 원재료비는 ① 원도급업체에서 원재료를 제공하는 조건이면 원도급업체에 계상하고, ② 하도급업체에서 일괄구입 사용하는 조건이면 하도급업체에서 원재료비를 계상보조재료비 : 손익계산서 및 건설원가 명세서상의 소모품비, 사무용품비수선비 : 건설 활동을 위하여 보유하고 있는 유형고정자산의 정상적인 기능유지를 위하여 그 수리를 외부에 의뢰하였을 경우에 지출된 제비용으로서 회계상 경비로 처리된 부분수도광열비 : 조사대상 기간 중 동력 및 자… Leer más
원재료비 : 공사시공을 위하여 실제로 투입(사용)된 원재료의 구입 가격에 운임을 포함한 금액원도급업체가 다른 업체와 하도급 계약을 맺을 경우의 원재료비는 ① 원도급업체에서 원재료를 제공하는 조건이면 원도급업체에 계상하고, ② 하도급업체에서 일괄구입 사용하는 조건이면 하도급업체에서 원재료비를 계상보조재료비 : 손익계산서 및 건설원가 명세서상의 소모품비, 사무용품비수선비 : 건설 활동을 위하여 보유하고 있는 유형고정자산의 정상적인 기능유지를 위하여 그 수리를 외부에 의뢰하였을 경우에 지출된 제비용으로서 회계상 경비로 처리된 부분수도광열비 : 조사대상 기간 중 동력 및 자가 발전용으로 사용한 모든 연료의 사용금액과 전기료, 가스료, 수도료 등을 말함급여총액 : 손익계산서의 판매비와 관리비 중 임원급여, 급료와 임금, 제수당 및 상여금, 잡급과 공사원가명세서의 노무비 중 급여, 임금, 제수당, 기타급여를 포함하며, 해외 건설공사의 경우 현지 고용한 외국인 노무자에 대한 급여는 제외함퇴직급여 : 손익계산서 및 공사원가명세서상의 퇴직급여 및 당년도 퇴직급여충당금전입액이 포함복리후생비 : 종업원에 대한 급여 이외의 위생, 보건, 위안, 요양 등 종업원의 복지와 후생을 위하여 지출한 제비용을 말하는데, 장기 결근자에 대한 급여, 양로연금, 종업원 레크레이션을 위한 운동시설, 영화, 여행, 운동회개최 등을 위한 제비용을 포함대손상각비 : 손익계산서상의 대손상각비로서 외상매출금, 받을 어음 등 채권의 추산액 또는 경상적인 대손상각을 말함임차료 : 건설활동을 위하여 제3자로부터 건물, 장비, 토지 등을 임차하였을 경우 그에 대한 임차료를 말함. 해외건설공사의 경우 외국인으로부터 임차한 대가로 지불한 임차료는 제외세금과공과 : 건설업활동과 관련된 각종 세금 및 공과금으로 등록세, 재산세, 취득세, 사업소득세, 자동차세, 협회비 등 공사원가 및 판매비와 관리비 부문에 포함되는 모든 세금과 공과금을 말한다.해외공사의 경우 외국정부 등에 납부한 조세공과는 제외하였으며 기타영업비용에 포함하였다.감가상각비 : 건물, 건설장비 등의 유형고정자산에 대한 감가상각비와 무형자산에 대한 상각비의 합계를 말함외주공사비 : 다른 업체에 하도급을 주었을 경우 하도급 업체에서 시공한 기성 부분에 대하여 지출하였거나 지출하여야 할 외주공사비를 말하며 연차 공사의 경우에는 조사대상 기간에 지출한 금액 또는 지출하여야 할 금액을 말함기타영업비용 : 상기 언급한 [원재료비, 보조재료비, 수선비, 수도광열비, 급여총액, 퇴직급여, 복리후생비, 임차료, 세금과공과, 감가상각비, 대손상각비, 외주공사비]를 제외한 손익계산서 및 공사원가명세서상의 건설 활동을 위하여 지출한 비용의 합계를 말함. 해외 건설공사의 경우에는 외국인에게 지불한 급여 및 임차료, 외국정부에 지출한 조세공과 등을 기타영업비용에 포함시킴부가가치 : 부가가치는 기업이 산업 활동을 한 결과 생산물의 가치 등에 새로 부가한 가치를 의미하며 이 조사의 부가가치는 다음과 같이 구함부가가치 = 급여총액 + 퇴직급여(퇴직급여충당금전입액 포함) + 복리후생비(보험료 포함) + 임차료 + 세금과공과 + 대손상각비 + 건설영업이익 + 납부부가가치세건설공사내역 : 건설공사내역은 조사기준년도에 이룩한 모든 공사를 건별로 계약액, 당년도 기성액 등을 공사종류별, 발주자별 및 공사 지역별로 구분 조사해외공사의 경우 외환금액은 조사기준연도 12. 31. 기준 외환은행 환율에 의한 환산치임계약종류 : 도급방법에 따라 원도급과 하도급으로 구분 조사하였음. 원도급이란 발주자로부터 1차적으로 도급받은 경우이며, 하도급이란 재도급 또는 하청을 말함이 조사에서는 국내 타 건설 업체로부터 도급받은 경우 하도급으로 간주하였으며 국내 건설회사가 아닌 외국건설 회사나 국내 종합무역상사 등에서 하도급 받은 경우에는 원도급으로 하였음. 또한 건설회사의 자기 건설이나 산하기업, 모기업을 위한 직영공사인 경우 원도급으로 하였음.기성액(공사액) : 기성액(공사액)이라 함은 건설업체에서 공사의 완공여부나 대금의 수취여부 등과는 관계없이 당해년도에 시공한 공사액을 말함. 즉, 공사수주금액 중 공사의 일부를 다른 업체에 하도급(원도급자의 외주공사액)을 준 경우에는 원도급자의 기성액에서 제외하였음당해년도 계약액(수주액) : 조사대상 업체가 발주자 또는 원도급자와 조사기준년도에 체결한 공사 계약액의 합계미기성액 : 조사기준년도에 시공하지 못하고 차년도로 이월된 공사액『당년도계약액 및 이월된 공사액 - 당년도 기성액』= 미기성액발주자 : 발주자라 함은 건설공사를 건설업자에게 도급하는 자를 말함. 다만, 수급인으로서 도급받은 건설공사를 하도급하는 자를 제외함도급 : 도급이라 함은 건설공사를 완성할 것을 약정하고, 상대방이 그 일의 결과에 대하여 대가를 지급할 것을 약정하는 계약원도급공사 : 발주자로부터 직접 건설공사를 완성할 것을 약정한 공사하도급공사 : 발주자로부터 건설공사를 도급받은 건설업자로부터 재 도급받은 건설공사를 말함조직형태 : 경영주체인 각 기업체의 법적 조직형태를 말하며 이 조사에서는 회사법인,회사이외의 법인 및 개인의 세 가지 형태로 구분법인 : 상법, 민법, 특별법에 의하여 설립되고 법인 등기를 완료하여 법인격을 취득하고 있는 기업체기술자, 기술공 : 건설공사의 설계 및 시공에 관한 전반적인 감독업무를 수행할 수 있는 자, 또는 전문직기술자가 지시한 작업내용을 원활하게 응용하여 기술공의 업무를 충분히 수행할 수 있는 자피고용자 : 일정한 산출기준에 의하여 임금, 봉급 또는 이에 준하는 형식의 급여를 받고 그 기업체에 고용되어 있는 모든 남여 종업원을 말하는데, 이에는 상용은 물론 임시 및 일용 종업원도 포함시켰음. 그러나 장기결근자(3개월 이상) 및 군복무자 등은 제외하였고, 해외공사의 경우에는 해외에서 근무하는 우리나라 피고용자만 조사하였고 외국에서 현지 고용한 외국인 피고용자는 제외함개인 : 법인체가 아닌 개인소유의 기업체를 말하는 것으로서 여기서는 법인격이 없는 조합과 같은 임의단체도 포함자 본 금 : 조사기준년도 12.31. 현재로 납입이 완료된 자본금 또는 출자금액종사자수 : 종사자라 함은 그 기업체의 공사현장 혹은 사무실 등을 가리지 않고, 조사대상 기간 중 건설업을 위한 업무에 종사한 피고용자수와 사업주 및 무급가족종사자수의 합계상용종사자 : 1년 이상의 고용계약에 의하여 실제의 취업시간에 관계없이 일정한 정액급여를 받는 종사자사무 및 기타 종업원 : 공사현장업무에는 직접 관여하지 않고 관리직, 전문직, 사무직 업무에 종사하는 자와 이들의 보조원 즉 급사, 사환, 수위, 승용차의 운전사 등을 말함기능공 : 건설공사의 시공에 직접 종사하는 자로서 ① 고등학교 졸업자와 ② 6개월 이상 조직적인 기술습득을 요하는 직종에서 1년 이상 경험을 가진 자, 또는 국가에서 공인하는 동등한 자격을 가진 자로서 통칭 숙련공을 말함임시종사자 : 1년 미만의 고용계약에 의하여 취업일수 및 취업시간에 따라 임금을 받는 잡부,인부,단순노무자 등을 포함한 현장근로 종사자사업주 및 무급가족종사자 : 사업주(출자자포함)와 그의 가족으로서 업체의 운영을 위하여 사무 또는 노무에 통상 작업시간의 ⅓ 이상을 종사하되 일정한 봉급이나 임금을 받지 않은 자를 말함. 사업주의 가족이라도 상시 근무에 종사하고 이에 대한 임금 또는 봉급의 형식으로 급여를 받은 자는 피고용자에 포함연간 급여액 : 조사대상기간에 정기 또는 부정기를 가리지 않고 피고용자에게 노무의 대가로 지급된 모든 현금급여,조사기준년도 이전의 급여로서 체불되었던 것을 조사기준년도 중에 지급한 것은 제외하고, 반면에 조사기준년도 중에 지급하여야 할 급여로서 미지급된 것은 포함매 출 액 : 매출액이라 함은 건설업체에서 당년도에 시공한 공사수익금액과 분양금액 등을 포함함. 미완성공사는 공사가 진행된 정도에 따라 수익이 실현된 것으로 봄.단, 공사수주 금액 중 공사의 일부를 다른 업체에 외주를 준 경우에는 제외(건설비용의 외주공사비로 조사)건설비용 : 1년간의 건설공사에 대하여 발생한 비용의 총계를 말함. 즉 건설공사원가명세서상의 경비와 손익계산서상의 판매비와 관리비를 말하는데, 건설업 이외의 타 산업을 겸하는 기업체는 겸업부문의 비용은 제외
🔴 Esta explicación la redactó el organismo que elabora la estadística. DATA CLOCK KOREA no la ha interpretado ni resumido. El original está en coreano; no lo traducimos, porque hacerlo dejaría de ser lo que el organismo escribió.
Fuente de los datos
- Organismo
- 국가데이터처
- Tabla
- 산업세분류 및 조직형태별 총괄
- Proveedor
- KOSIS 국가통계포털
- Periodo
- 2008 ~ 2023
- Fecha de extracción
- 2026-08-29
- Tratamiento
- KOSIS OpenAPI 로 연간 전국값을 받아 그대로 사용. 가공 없음.
Otras encuestas de esta categoría
- Construction Industry Survey1 tablas · 102 partidas
- Construction Business Trend Survey13 tablas · 159 partidas
- Building Permit, Start and Completion Statistics4 tablas · 26 partidas
- Building Statistics1 tablas · 113 partidas
- Urban Redevelopment Project Status5 tablas · 26 partidas
- Overseas Construction Orders Statistics3 tablas · 78 partidas