Construction Industry Survey (10/49)
1 tablas y 120 partidas de la encuesta KOSIS «Construction Industry Survey», en cifras y gráficos anuales.
공사종류/등록업종별 수주액,기성액,원도급 및 하도급공사 기성액,미기성액
Volver arriba공사종류별 총계 · 등록업종별 합계
- Value of orders received
- Building construction Value of orders received
- Detached & tenement house Value of orders received
- Low-rise apartment(less than 5th floor) Value of orders received
- High-rise apartment(6~15 floor) Value of orders received
- APT(16 floor or more) Value of orders received
- Residential shop Value of orders received
- Market department store Value of orders received
- Office building Value of orders received
- Officetel Value of orders received
- Intelligent building Value of orders received
- Public building(less than 11th floor) Value of orders received
- Public building(11th floor more) Value of orders received
- Hotel & lodgings Value of orders received
- Educational facilities Value of orders received
- Hospital Value of orders received
- Church & temple Value of orders received
- Traditional style building Value of orders received
- Other cultural building Value of orders received
- Public & Performance Value of orders received
- Stadium & playground Value of orders received
- Exhibition pavilion Value of orders received
- Factory & workshop Value of orders received
- Machine installation (except plant) Value of orders received
- Value of construction completed
- Building construction Value of construction completed
- Detached & tenement house Value of construction completed
- Low-rise apartment(less than 5th floor) Value of construction completed
- High-rise apartment(6~15 floor) Value of construction completed
- APT(16 floor or more) Value of construction completed
- Residential shop Value of construction completed
- Market department store Value of construction completed
- Office building Value of construction completed
- Officetel Value of construction completed
- Intelligent building Value of construction completed
- Public building(less than 11th floor) Value of construction completed
- Public building(11th floor more) Value of construction completed
- Hotel & lodgings Value of construction completed
- Educational facilities Value of construction completed
- Hospital Value of construction completed
- Church & temple Value of construction completed
- Traditional style building Value of construction completed
- Other cultural building Value of construction completed
- Public & Performance Value of construction completed
- Stadium & playground Value of construction completed
- Exhibition pavilion Value of construction completed
- Factory & workshop Value of construction completed
- Machine installation (except plant) Value of construction completed
- Value of construction completed in original contract
- Building construction Value of construction completed in original contract
- Detached & tenement house Value of construction completed in original contract
- Low-rise apartment(less than 5th floor) Value of construction completed in original contract
- High-rise apartment(6~15 floor) Value of construction completed in original contract
- APT(16 floor or more) Value of construction completed in original contract
- Residential shop Value of construction completed in original contract
- Market department store Value of construction completed in original contract
- Office building Value of construction completed in original contract
- Officetel Value of construction completed in original contract
- Intelligent building Value of construction completed in original contract
- Public building(less than 11th floor) Value of construction completed in original contract
- Public building(11th floor more) Value of construction completed in original contract
- Hotel & lodgings Value of construction completed in original contract
- Educational facilities Value of construction completed in original contract
- Hospital Value of construction completed in original contract
- Church & temple Value of construction completed in original contract
- Traditional style building Value of construction completed in original contract
- Other cultural building Value of construction completed in original contract
- Public & Performance Value of construction completed in original contract
- Stadium & playground Value of construction completed in original contract
- Exhibition pavilion Value of construction completed in original contract
- Factory & workshop Value of construction completed in original contract
- Machine installation (except plant) Value of construction completed in original contract
- Value of construction completed in subcontract
- Building construction Value of construction completed in subcontract
- Detached & tenement house Value of construction completed in subcontract
- Low-rise apartment(less than 5th floor) Value of construction completed in subcontract
- High-rise apartment(6~15 floor) Value of construction completed in subcontract
- APT(16 floor or more) Value of construction completed in subcontract
- Residential shop Value of construction completed in subcontract
- Market department store Value of construction completed in subcontract
- Office building Value of construction completed in subcontract
- Officetel Value of construction completed in subcontract
- Intelligent building Value of construction completed in subcontract
- Public building(less than 11th floor) Value of construction completed in subcontract
- Public building(11th floor more) Value of construction completed in subcontract
- Hotel & lodgings Value of construction completed in subcontract
- Educational facilities Value of construction completed in subcontract
- Hospital Value of construction completed in subcontract
- Church & temple Value of construction completed in subcontract
- Traditional style building Value of construction completed in subcontract
- Other cultural building Value of construction completed in subcontract
- Public & Performance Value of construction completed in subcontract
- Stadium & playground Value of construction completed in subcontract
- Exhibition pavilion Value of construction completed in subcontract
- Factory & workshop Value of construction completed in subcontract
- Machine installation (except plant) Value of construction completed in subcontract
- Value of carry-over work
- Building construction Value of carry-over work
- Detached & tenement house Value of carry-over work
- Low-rise apartment(less than 5th floor) Value of carry-over work
- High-rise apartment(6~15 floor) Value of carry-over work
- APT(16 floor or more) Value of carry-over work
- Residential shop Value of carry-over work
- Market department store Value of carry-over work
- Office building Value of carry-over work
- Officetel Value of carry-over work
- Intelligent building Value of carry-over work
- Public building(less than 11th floor) Value of carry-over work
- Public building(11th floor more) Value of carry-over work
- Hotel & lodgings Value of carry-over work
- Educational facilities Value of carry-over work
- Hospital Value of carry-over work
- Church & temple Value of carry-over work
- Traditional style building Value of carry-over work
- Other cultural building Value of carry-over work
- Public & Performance Value of carry-over work
- Stadium & playground Value of carry-over work
- Exhibition pavilion Value of carry-over work
- Factory & workshop Value of carry-over work
- Machine installation (except plant) Value of carry-over work
Value of orders received
1994 87,295,851Million Won→2007 274,458,722Million Won▲ +214.4%
Building construction Value of orders received
1994 58,932,845Million Won→2007 163,742,321Million Won▲ +177.8%
Detached & tenement house Value of orders received
1994 1,865,405Million Won→2007 2,454,739Million Won▲ +31.6%
Low-rise apartment(less than 5th floor) Value of orders received
1994 980,175Million Won→2007 942,015Million Won▼ −3.9%
High-rise apartment(6~15 floor) Value of orders received
1994 13,669,207Million Won→2007 21,019,818Million Won▲ +53.8%
APT(16 floor or more) Value of orders received
1994 7,235,961Million Won→2007 50,299,832Million Won▲ +595.1%
Residential shop Value of orders received
1994 1,929,862Million Won→2007 9,115,890Million Won▲ +372.4%
Market department store Value of orders received
1994 4,288,265Million Won→2007 8,022,492Million Won▲ +87.1%
Office building Value of orders received
1994 5,804,660Million Won→2007 8,664,251Million Won▲ +49.3%
Officetel Value of orders received
1997 1,786,594Million Won→2007 2,131,089Million Won▲ +19.3%
Intelligent building Value of orders received
1997 494,138Million Won→2007 491,616Million Won▼ −0.5%
Public building(less than 11th floor) Value of orders received
1994 1,863,863Million Won→2007 3,826,813Million Won▲ +105.3%
Public building(11th floor more) Value of orders received
1997 215,107Million Won→2007 419,772Million Won▲ +95.1%
Hotel & lodgings Value of orders received
1994 1,282,803Million Won→2007 5,171,947Million Won▲ +303.2%
Educational facilities Value of orders received
1994 2,474,618Million Won→2007 8,440,263Million Won▲ +241.1%
Hospital Value of orders received
1994 1,043,921Million Won→2007 2,600,164Million Won▲ +149.1%
Church & temple Value of orders received
1994 716,846Million Won→2007 1,417,595Million Won▲ +97.8%
Traditional style building Value of orders received
1994 114,593Million Won→2007 47,571Million Won▼ −58.5%
Other cultural building Value of orders received
1997 114,101Million Won→2007 74,683Million Won▼ −34.5%
Public & Performance Value of orders received
1994 1,097,841Million Won→2007 845,693Million Won▼ −23.0%
Stadium & playground Value of orders received
1994 515,506Million Won→2007 1,017,500Million Won▲ +97.4%
Exhibition pavilion Value of orders received
1997 729,420Million Won→2007 1,527,201Million Won▲ +109.4%
Factory & workshop Value of orders received
1994 9,470,264Million Won→2007 17,706,033Million Won▲ +87.0%
Machine installation (except plant) Value of orders received
1994 1,546,749Million Won→2007 2,364,347Million Won▲ +52.9%
Value of construction completed
1994 68,057,102Million Won→2007 181,667,024Million Won▲ +166.9%
Building construction Value of construction completed
1994 46,645,697Million Won→2007 103,329,833Million Won▲ +121.5%
Detached & tenement house Value of construction completed
1994 1,809,737Million Won→2007 1,174,933Million Won▼ −35.1%
Low-rise apartment(less than 5th floor) Value of construction completed
1994 1,054,570Million Won→2007 510,200Million Won▼ −51.6%
High-rise apartment(6~15 floor) Value of construction completed
1994 12,503,488Million Won→2007 12,771,121Million Won▲ +2.1%
APT(16 floor or more) Value of construction completed
1994 4,992,033Million Won→2007 26,803,477Million Won▲ +436.9%
Residential shop Value of construction completed
1994 916,338Million Won→2007 5,699,068Million Won▲ +521.9%
Market department store Value of construction completed
1994 2,792,625Million Won→2007 5,421,429Million Won▲ +94.1%
Office building Value of construction completed
1994 4,770,647Million Won→2007 5,539,060Million Won▲ +16.1%
Officetel Value of construction completed
1997 705,159Million Won→2007 1,443,202Million Won▲ +104.7%
Intelligent building Value of construction completed
1997 626,947Million Won→2007 852,329Million Won▲ +35.9%
Public building(less than 11th floor) Value of construction completed
1994 1,909,856Million Won→2007 3,321,612Million Won▲ +73.9%
Public building(11th floor more) Value of construction completed
1997 358,149Million Won→2007 458,626Million Won▲ +28.1%
Hotel & lodgings Value of construction completed
1994 904,077Million Won→2007 2,104,836Million Won▲ +132.8%
Educational facilities Value of construction completed
1994 1,872,233Million Won→2007 5,617,439Million Won▲ +200.0%
Hospital Value of construction completed
1994 938,579Million Won→2007 2,072,260Million Won▲ +120.8%
Church & temple Value of construction completed
1994 338,327Million Won→2007 950,853Million Won▲ +181.0%
Traditional style building Value of construction completed
1994 118,863Million Won→2007 34,370Million Won▼ −71.1%
Other cultural building Value of construction completed
1997 111,594Million Won→2007 84,198Million Won▼ −24.5%
Public & Performance Value of construction completed
1994 808,848Million Won→2007 706,143Million Won▼ −12.7%
Stadium & playground Value of construction completed
1994 374,063Million Won→2007 798,959Million Won▲ +113.6%
Exhibition pavilion Value of construction completed
1997 447,478Million Won→2007 1,176,413Million Won▲ +162.9%
Factory & workshop Value of construction completed
1994 7,389,254Million Won→2007 12,985,780Million Won▲ +75.7%
Machine installation (except plant) Value of construction completed
1994 912,401Million Won→2007 1,132,783Million Won▲ +24.2%
Value of construction completed in original contract
1994 52,960,030Million Won→2007 121,741,956Million Won▲ +129.9%
Building construction Value of construction completed in original contract
1994 37,233,500Million Won→2007 67,556,640Million Won▲ +81.4%
Detached & tenement house Value of construction completed in original contract
1994 1,661,773Million Won→2007 865,689Million Won▼ −47.9%
Low-rise apartment(less than 5th floor) Value of construction completed in original contract
1994 760,728Million Won→2007 324,076Million Won▼ −57.4%
High-rise apartment(6~15 floor) Value of construction completed in original contract
1994 10,464,936Million Won→2007 7,954,297Million Won▼ −24.0%
APT(16 floor or more) Value of construction completed in original contract
1994 4,641,979Million Won→2007 17,244,567Million Won▲ +271.5%
Residential shop Value of construction completed in original contract
1994 766,254Million Won→2007 3,971,597Million Won▲ +418.3%
Market department store Value of construction completed in original contract
1994 2,193,289Million Won→2007 3,925,387Million Won▲ +79.0%
Office building Value of construction completed in original contract
1994 3,412,861Million Won→2007 3,954,529Million Won▲ +15.9%
Officetel Value of construction completed in original contract
1997 469,814Million Won→2007 924,501Million Won▲ +96.8%
Intelligent building Value of construction completed in original contract
1997 532,582Million Won→2007 572,449Million Won▲ +7.5%
Public building(less than 11th floor) Value of construction completed in original contract
1994 1,422,837Million Won→2007 2,139,473Million Won▲ +50.4%
Public building(11th floor more) Value of construction completed in original contract
1997 205,725Million Won→2007 291,062Million Won▲ +41.5%
Hotel & lodgings Value of construction completed in original contract
1994 727,082Million Won→2007 1,420,656Million Won▲ +95.4%
Educational facilities Value of construction completed in original contract
1994 1,440,902Million Won→2007 3,452,383Million Won▲ +139.6%
Hospital Value of construction completed in original contract
1994 687,688Million Won→2007 1,275,664Million Won▲ +85.5%
Church & temple Value of construction completed in original contract
1994 255,821Million Won→2007 579,109Million Won▲ +126.4%
Traditional style building Value of construction completed in original contract
1994 91,418Million Won→2007 24,779Million Won▼ −72.9%
Other cultural building Value of construction completed in original contract
1997 87,851Million Won→2007 51,726Million Won▼ −41.1%
Public & Performance Value of construction completed in original contract
1994 582,606Million Won→2007 439,413Million Won▼ −24.6%
Stadium & playground Value of construction completed in original contract
1994 244,071Million Won→2007 467,431Million Won▲ +91.5%
Exhibition pavilion Value of construction completed in original contract
1997 333,631Million Won→2007 827,302Million Won▲ +148.0%
Factory & workshop Value of construction completed in original contract
1994 5,515,025Million Won→2007 8,985,914Million Won▲ +62.9%
Machine installation (except plant) Value of construction completed in original contract
1994 659,240Million Won→2007 852,787Million Won▲ +29.4%
Value of construction completed in subcontract
1994 15,097,072Million Won→2007 59,925,068Million Won▲ +296.9%
Building construction Value of construction completed in subcontract
1994 9,412,197Million Won→2007 35,773,192Million Won▲ +280.1%
Detached & tenement house Value of construction completed in subcontract
1994 147,964Million Won→2007 309,243Million Won▲ +109.0%
Low-rise apartment(less than 5th floor) Value of construction completed in subcontract
1994 293,842Million Won→2007 186,123Million Won▼ −36.7%
High-rise apartment(6~15 floor) Value of construction completed in subcontract
1994 2,038,551Million Won→2007 4,816,823Million Won▲ +136.3%
APT(16 floor or more) Value of construction completed in subcontract
1994 350,053Million Won→2007 9,558,910Million Won▲ +2630.7%
Residential shop Value of construction completed in subcontract
1994 150,083Million Won→2007 1,727,471Million Won▲ +1051.0%
Market department store Value of construction completed in subcontract
1994 599,335Million Won→2007 1,496,041Million Won▲ +149.6%
Office building Value of construction completed in subcontract
1994 1,357,786Million Won→2007 1,584,530Million Won▲ +16.7%
Officetel Value of construction completed in subcontract
1997 235,344Million Won→2007 518,700Million Won▲ +120.4%
Intelligent building Value of construction completed in subcontract
1997 94,365Million Won→2007 279,880Million Won▲ +196.6%
Public building(less than 11th floor) Value of construction completed in subcontract
1994 487,018Million Won→2007 1,182,139Million Won▲ +142.7%
Public building(11th floor more) Value of construction completed in subcontract
1997 152,424Million Won→2007 167,564Million Won▲ +9.9%
Hotel & lodgings Value of construction completed in subcontract
1994 176,995Million Won→2007 684,179Million Won▲ +286.6%
Educational facilities Value of construction completed in subcontract
1994 431,331Million Won→2007 2,165,055Million Won▲ +401.9%
Hospital Value of construction completed in subcontract
1994 250,890Million Won→2007 796,595Million Won▲ +217.5%
Church & temple Value of construction completed in subcontract
1994 82,506Million Won→2007 371,743Million Won▲ +350.6%
Traditional style building Value of construction completed in subcontract
1994 27,444Million Won→2007 9,591Million Won▼ −65.1%
Other cultural building Value of construction completed in subcontract
1997 23,742Million Won→2007 32,472Million Won▲ +36.8%
Public & Performance Value of construction completed in subcontract
1994 226,242Million Won→2007 266,729Million Won▲ +17.9%
Stadium & playground Value of construction completed in subcontract
1994 129,992Million Won→2007 331,528Million Won▲ +155.0%
Exhibition pavilion Value of construction completed in subcontract
1997 113,846Million Won→2007 349,110Million Won▲ +206.7%
Factory & workshop Value of construction completed in subcontract
1994 1,874,228Million Won→2007 3,999,865Million Won▲ +113.4%
Machine installation (except plant) Value of construction completed in subcontract
1994 253,160Million Won→2007 279,995Million Won▲ +10.6%
Value of carry-over work
1994 89,227,352Million Won→2007 340,345,467Million Won▲ +281.4%
Building construction Value of carry-over work
1994 61,831,304Million Won→2007 203,525,660Million Won▲ +229.2%
Detached & tenement house Value of carry-over work
1994 1,113,821Million Won→2007 2,394,490Million Won▲ +115.0%
Low-rise apartment(less than 5th floor) Value of carry-over work
1994 842,986Million Won→2007 988,259Million Won▲ +17.2%
High-rise apartment(6~15 floor) Value of carry-over work
1994 16,079,338Million Won→2007 31,960,315Million Won▲ +98.8%
APT(16 floor or more) Value of carry-over work
1994 12,802,626Million Won→2007 83,917,161Million Won▲ +555.5%
Residential shop Value of carry-over work
1994 2,826,709Million Won→2007 14,126,313Million Won▲ +399.7%
Market department store Value of carry-over work
1994 3,866,108Million Won→2007 8,508,709Million Won▲ +120.1%
Office building Value of carry-over work
1994 6,644,647Million Won→2007 7,894,185Million Won▲ +18.8%
Officetel Value of carry-over work
1997 2,239,966Million Won→2007 2,717,141Million Won▲ +21.3%
Intelligent building Value of carry-over work
1997 1,141,390Million Won→2007 1,083,836Million Won▼ −5.0%
Public building(less than 11th floor) Value of carry-over work
1994 1,698,035Million Won→2007 2,907,925Million Won▲ +71.3%
Public building(11th floor more) Value of carry-over work
1997 229,201Million Won→2007 376,683Million Won▲ +64.3%
Hotel & lodgings Value of carry-over work
1994 1,250,251Million Won→2007 5,553,213Million Won▲ +344.2%
Educational facilities Value of carry-over work
1994 1,700,122Million Won→2007 6,707,273Million Won▲ +294.5%
Hospital Value of carry-over work
1994 1,223,800Million Won→2007 3,067,299Million Won▲ +150.6%
Church & temple Value of carry-over work
1994 616,199Million Won→2007 1,490,452Million Won▲ +141.9%
Traditional style building Value of carry-over work
1994 59,323Million Won→2007 84,099Million Won▲ +41.8%
Other cultural building Value of carry-over work
1997 59,123Million Won→2007 47,388Million Won▼ −19.8%
Public & Performance Value of carry-over work
1994 979,469Million Won→2007 801,372Million Won▼ −18.2%
Stadium & playground Value of carry-over work
1994 431,119Million Won→2007 913,513Million Won▲ +111.9%
Exhibition pavilion Value of carry-over work
1997 508,136Million Won→2007 1,067,930Million Won▲ +110.2%
Factory & workshop Value of carry-over work
1994 5,864,664Million Won→2007 11,832,992Million Won▲ +101.8%
Machine installation (except plant) Value of carry-over work
1994 1,156,292Million Won→2007 2,200,029Million Won▲ +90.3%
Qué es esta estadística
Construction Industry Survey· - 건설업체 → 건설관련기관(6개) → 국가데이터처
- Términos clave
- Para qué se elabora
- 우리나라 건설업부문의 구조 및 산업활동 실태를 파악하여 정책수립에 필요한 기초자료 제공 활용분야 : 건설관련 정책수립, GDP.산업연관표 및 GRDP작성, 월간조사 모집단 자료로 활용
- Qué se investiga
- 기업체
원재료비 : 공사시공을 위하여 실제로 투입(사용)된 원재료의 구입 가격에 운임을 포함한 금액원도급업체가 다른 업체와 하도급 계약을 맺을 경우의 원재료비는 ① 원도급업체에서 원재료를 제공하는 조건이면 원도급업체에 계상하고, ② 하도급업체에서 일괄구입 사용하는 조건이면 하도급업체에서 원재료비를 계상보조재료비 : 손익계산서 및 건설원가 명세서상의 소모품비, 사무용품비수선비 : 건설 활동을 위하여 보유하고 있는 유형고정자산의 정상적인 기능유지를 위하여 그 수리를 외부에 의뢰하였을 경우에 지출된 제비용으로서 회계상 경비로 처리된 부분수도광열비 : 조사대상 기간 중 동력 및 자… Leer más
원재료비 : 공사시공을 위하여 실제로 투입(사용)된 원재료의 구입 가격에 운임을 포함한 금액원도급업체가 다른 업체와 하도급 계약을 맺을 경우의 원재료비는 ① 원도급업체에서 원재료를 제공하는 조건이면 원도급업체에 계상하고, ② 하도급업체에서 일괄구입 사용하는 조건이면 하도급업체에서 원재료비를 계상보조재료비 : 손익계산서 및 건설원가 명세서상의 소모품비, 사무용품비수선비 : 건설 활동을 위하여 보유하고 있는 유형고정자산의 정상적인 기능유지를 위하여 그 수리를 외부에 의뢰하였을 경우에 지출된 제비용으로서 회계상 경비로 처리된 부분수도광열비 : 조사대상 기간 중 동력 및 자가 발전용으로 사용한 모든 연료의 사용금액과 전기료, 가스료, 수도료 등을 말함급여총액 : 손익계산서의 판매비와 관리비 중 임원급여, 급료와 임금, 제수당 및 상여금, 잡급과 공사원가명세서의 노무비 중 급여, 임금, 제수당, 기타급여를 포함하며, 해외 건설공사의 경우 현지 고용한 외국인 노무자에 대한 급여는 제외함퇴직급여 : 손익계산서 및 공사원가명세서상의 퇴직급여 및 당년도 퇴직급여충당금전입액이 포함복리후생비 : 종업원에 대한 급여 이외의 위생, 보건, 위안, 요양 등 종업원의 복지와 후생을 위하여 지출한 제비용을 말하는데, 장기 결근자에 대한 급여, 양로연금, 종업원 레크레이션을 위한 운동시설, 영화, 여행, 운동회개최 등을 위한 제비용을 포함대손상각비 : 손익계산서상의 대손상각비로서 외상매출금, 받을 어음 등 채권의 추산액 또는 경상적인 대손상각을 말함임차료 : 건설활동을 위하여 제3자로부터 건물, 장비, 토지 등을 임차하였을 경우 그에 대한 임차료를 말함. 해외건설공사의 경우 외국인으로부터 임차한 대가로 지불한 임차료는 제외세금과공과 : 건설업활동과 관련된 각종 세금 및 공과금으로 등록세, 재산세, 취득세, 사업소득세, 자동차세, 협회비 등 공사원가 및 판매비와 관리비 부문에 포함되는 모든 세금과 공과금을 말한다.해외공사의 경우 외국정부 등에 납부한 조세공과는 제외하였으며 기타영업비용에 포함하였다.감가상각비 : 건물, 건설장비 등의 유형고정자산에 대한 감가상각비와 무형자산에 대한 상각비의 합계를 말함외주공사비 : 다른 업체에 하도급을 주었을 경우 하도급 업체에서 시공한 기성 부분에 대하여 지출하였거나 지출하여야 할 외주공사비를 말하며 연차 공사의 경우에는 조사대상 기간에 지출한 금액 또는 지출하여야 할 금액을 말함기타영업비용 : 상기 언급한 [원재료비, 보조재료비, 수선비, 수도광열비, 급여총액, 퇴직급여, 복리후생비, 임차료, 세금과공과, 감가상각비, 대손상각비, 외주공사비]를 제외한 손익계산서 및 공사원가명세서상의 건설 활동을 위하여 지출한 비용의 합계를 말함. 해외 건설공사의 경우에는 외국인에게 지불한 급여 및 임차료, 외국정부에 지출한 조세공과 등을 기타영업비용에 포함시킴부가가치 : 부가가치는 기업이 산업 활동을 한 결과 생산물의 가치 등에 새로 부가한 가치를 의미하며 이 조사의 부가가치는 다음과 같이 구함부가가치 = 급여총액 + 퇴직급여(퇴직급여충당금전입액 포함) + 복리후생비(보험료 포함) + 임차료 + 세금과공과 + 대손상각비 + 건설영업이익 + 납부부가가치세건설공사내역 : 건설공사내역은 조사기준년도에 이룩한 모든 공사를 건별로 계약액, 당년도 기성액 등을 공사종류별, 발주자별 및 공사 지역별로 구분 조사해외공사의 경우 외환금액은 조사기준연도 12. 31. 기준 외환은행 환율에 의한 환산치임계약종류 : 도급방법에 따라 원도급과 하도급으로 구분 조사하였음. 원도급이란 발주자로부터 1차적으로 도급받은 경우이며, 하도급이란 재도급 또는 하청을 말함이 조사에서는 국내 타 건설 업체로부터 도급받은 경우 하도급으로 간주하였으며 국내 건설회사가 아닌 외국건설 회사나 국내 종합무역상사 등에서 하도급 받은 경우에는 원도급으로 하였음. 또한 건설회사의 자기 건설이나 산하기업, 모기업을 위한 직영공사인 경우 원도급으로 하였음.기성액(공사액) : 기성액(공사액)이라 함은 건설업체에서 공사의 완공여부나 대금의 수취여부 등과는 관계없이 당해년도에 시공한 공사액을 말함. 즉, 공사수주금액 중 공사의 일부를 다른 업체에 하도급(원도급자의 외주공사액)을 준 경우에는 원도급자의 기성액에서 제외하였음당해년도 계약액(수주액) : 조사대상 업체가 발주자 또는 원도급자와 조사기준년도에 체결한 공사 계약액의 합계미기성액 : 조사기준년도에 시공하지 못하고 차년도로 이월된 공사액『당년도계약액 및 이월된 공사액 - 당년도 기성액』= 미기성액발주자 : 발주자라 함은 건설공사를 건설업자에게 도급하는 자를 말함. 다만, 수급인으로서 도급받은 건설공사를 하도급하는 자를 제외함도급 : 도급이라 함은 건설공사를 완성할 것을 약정하고, 상대방이 그 일의 결과에 대하여 대가를 지급할 것을 약정하는 계약원도급공사 : 발주자로부터 직접 건설공사를 완성할 것을 약정한 공사하도급공사 : 발주자로부터 건설공사를 도급받은 건설업자로부터 재 도급받은 건설공사를 말함조직형태 : 경영주체인 각 기업체의 법적 조직형태를 말하며 이 조사에서는 회사법인,회사이외의 법인 및 개인의 세 가지 형태로 구분법인 : 상법, 민법, 특별법에 의하여 설립되고 법인 등기를 완료하여 법인격을 취득하고 있는 기업체기술자, 기술공 : 건설공사의 설계 및 시공에 관한 전반적인 감독업무를 수행할 수 있는 자, 또는 전문직기술자가 지시한 작업내용을 원활하게 응용하여 기술공의 업무를 충분히 수행할 수 있는 자피고용자 : 일정한 산출기준에 의하여 임금, 봉급 또는 이에 준하는 형식의 급여를 받고 그 기업체에 고용되어 있는 모든 남여 종업원을 말하는데, 이에는 상용은 물론 임시 및 일용 종업원도 포함시켰음. 그러나 장기결근자(3개월 이상) 및 군복무자 등은 제외하였고, 해외공사의 경우에는 해외에서 근무하는 우리나라 피고용자만 조사하였고 외국에서 현지 고용한 외국인 피고용자는 제외함개인 : 법인체가 아닌 개인소유의 기업체를 말하는 것으로서 여기서는 법인격이 없는 조합과 같은 임의단체도 포함자 본 금 : 조사기준년도 12.31. 현재로 납입이 완료된 자본금 또는 출자금액종사자수 : 종사자라 함은 그 기업체의 공사현장 혹은 사무실 등을 가리지 않고, 조사대상 기간 중 건설업을 위한 업무에 종사한 피고용자수와 사업주 및 무급가족종사자수의 합계상용종사자 : 1년 이상의 고용계약에 의하여 실제의 취업시간에 관계없이 일정한 정액급여를 받는 종사자사무 및 기타 종업원 : 공사현장업무에는 직접 관여하지 않고 관리직, 전문직, 사무직 업무에 종사하는 자와 이들의 보조원 즉 급사, 사환, 수위, 승용차의 운전사 등을 말함기능공 : 건설공사의 시공에 직접 종사하는 자로서 ① 고등학교 졸업자와 ② 6개월 이상 조직적인 기술습득을 요하는 직종에서 1년 이상 경험을 가진 자, 또는 국가에서 공인하는 동등한 자격을 가진 자로서 통칭 숙련공을 말함임시종사자 : 1년 미만의 고용계약에 의하여 취업일수 및 취업시간에 따라 임금을 받는 잡부,인부,단순노무자 등을 포함한 현장근로 종사자사업주 및 무급가족종사자 : 사업주(출자자포함)와 그의 가족으로서 업체의 운영을 위하여 사무 또는 노무에 통상 작업시간의 ⅓ 이상을 종사하되 일정한 봉급이나 임금을 받지 않은 자를 말함. 사업주의 가족이라도 상시 근무에 종사하고 이에 대한 임금 또는 봉급의 형식으로 급여를 받은 자는 피고용자에 포함연간 급여액 : 조사대상기간에 정기 또는 부정기를 가리지 않고 피고용자에게 노무의 대가로 지급된 모든 현금급여,조사기준년도 이전의 급여로서 체불되었던 것을 조사기준년도 중에 지급한 것은 제외하고, 반면에 조사기준년도 중에 지급하여야 할 급여로서 미지급된 것은 포함매 출 액 : 매출액이라 함은 건설업체에서 당년도에 시공한 공사수익금액과 분양금액 등을 포함함. 미완성공사는 공사가 진행된 정도에 따라 수익이 실현된 것으로 봄.단, 공사수주 금액 중 공사의 일부를 다른 업체에 외주를 준 경우에는 제외(건설비용의 외주공사비로 조사)건설비용 : 1년간의 건설공사에 대하여 발생한 비용의 총계를 말함. 즉 건설공사원가명세서상의 경비와 손익계산서상의 판매비와 관리비를 말하는데, 건설업 이외의 타 산업을 겸하는 기업체는 겸업부문의 비용은 제외
🔴 Esta explicación la redactó el organismo que elabora la estadística. DATA CLOCK KOREA no la ha interpretado ni resumido. El original está en coreano; no lo traducimos, porque hacerlo dejaría de ser lo que el organismo escribió.
Fuente de los datos
- Organismo
- 국가데이터처
- Tabla
- 산업세분류 및 조직형태별 총괄
- Proveedor
- KOSIS 국가통계포털
- Periodo
- 1994 ~ 2007
- Fecha de extracción
- 2026-08-29
- Tratamiento
- KOSIS OpenAPI 로 연간 전국값을 받아 그대로 사용. 가공 없음.
Otras encuestas de esta categoría
- Construction Industry Survey1 tablas · 102 partidas
- Construction Business Trend Survey13 tablas · 159 partidas
- Building Permit, Start and Completion Statistics4 tablas · 26 partidas
- Building Statistics1 tablas · 113 partidas
- Urban Redevelopment Project Status5 tablas · 26 partidas
- Overseas Construction Orders Statistics3 tablas · 78 partidas