Data Clock Korea
Explorar los datos
Construction

Construction Industry Survey (12/49)

1 tablas y 120 partidas de la encuesta KOSIS «Construction Industry Survey», en cifras y gráficos anuales.

공사지역/등록업종별 수주액,기성액,원도급 및 하도급공사 기성액,미기성액

Volver arriba

공사지역별 전체 · 등록업종별 합계

Total Value of orders received

1994 87,295,851Million Won2007 274,458,722Million Won▲ +214.4%

General construction Value of orders received

1994 57,476,675Million Won2007 185,414,272Million Won▲ +222.6%

Special construction Value of orders received

1994 22,617,976Million Won2007 64,363,046Million Won▲ +184.6%

Interior architecture works Value of orders received

1994 1,428,736Million Won2007 7,280,210Million Won▲ +409.6%

Excavating and earthmoving Value of orders received

1994 4,196,827Million Won2007 8,776,444Million Won▲ +109.1%

Plastering waterproofing masonry construction business Value of orders received

1994 1,461,329Million Won2007 2,625,564Million Won▲ +79.7%

Stone works Value of orders received

1994 433,849Million Won2007 1,722,960Million Won▲ +297.1%

Painting works Value of orders received

1994 525,457Million Won2007 1,172,487Million Won▲ +123.1%

Scaffolding demolition works Value of orders received

1994 1,879,643Million Won2007 1,308,075Million Won▼ −30.4%

Metal structure installation and Erection of doors Value of orders received

1994 1,068,332Million Won2007 5,504,249Million Won▲ +415.2%

Roofing sheet metal prefabrication Value of orders received

1994 294,223Million Won2007 923,496Million Won▲ +213.9%

Steel Reinforcing and Reinforced Concrete Works Value of orders received

1994 4,718,677Million Won2007 12,204,342Million Won▲ +158.6%

Utility service works Value of orders received

1994 4,169,482Million Won2007 8,813,532Million Won▲ +111.4%

Water supply & sewerages Value of orders received

1994 637,836Million Won2007 2,708,376Million Won▲ +324.6%

Boring & gronting works Value of orders received

1994 417,574Million Won2007 864,388Million Won▲ +107.0%

Special Railway Laying Works Value of orders received

1994 72,046Million Won2007 196,374Million Won▲ +172.6%

Pavement Value of orders received

1994 363,039Million Won2007 1,273,680Million Won▲ +250.8%

Underwater works Value of orders received

1994 252,748Million Won2007 655,247Million Won▲ +159.2%

Landscape Planting Works Value of orders received

1994 218,370Million Won2007 1,884,100Million Won▲ +762.8%

Landscape Works Facility Value of orders received

1994 104,760Million Won2007 1,073,757Million Won▲ +925.0%

Steel frame works Value of orders received

1994 326,564Million Won2007 2,511,348Million Won▲ +669.0%

Iron & steel installation Value of orders received

1994 5,837Million Won2007 231,907Million Won▲ +3873.1%

Cableway installation Value of orders received

1998 109Million Won2007 11,434Million Won▲ +10389.9%

Dredging Value of orders received

1997 145,835Million Won2007 185,775Million Won▲ +27.4%

Total Value of construction completed

1994 68,057,102Million Won2007 181,667,024Million Won▲ +166.9%

General construction Value of construction completed

1994 36,512,334Million Won2007 84,079,732Million Won▲ +130.3%

Special construction Value of construction completed

1994 23,131,699Million Won2007 69,501,674Million Won▲ +200.5%

Interior architecture works Value of construction completed

1994 1,451,451Million Won2007 7,479,027Million Won▲ +415.3%

Excavating and earthmoving Value of construction completed

1994 4,134,580Million Won2007 9,876,057Million Won▲ +138.9%

Plastering waterproofing masonry construction business Value of construction completed

1994 1,608,590Million Won2007 2,911,159Million Won▲ +81.0%

Stone works Value of construction completed

1994 432,356Million Won2007 1,952,673Million Won▲ +351.6%

Painting works Value of construction completed

1994 565,792Million Won2007 1,334,087Million Won▲ +135.8%

Scaffolding demolition works Value of construction completed

1994 1,871,402Million Won2007 1,299,576Million Won▼ −30.6%

Metal structure installation and Erection of doors Value of construction completed

1994 1,153,039Million Won2007 6,001,309Million Won▲ +420.5%

Roofing sheet metal prefabrication Value of construction completed

1994 266,599Million Won2007 996,670Million Won▲ +273.8%

Steel Reinforcing and Reinforced Concrete Works Value of construction completed

1994 4,675,172Million Won2007 13,045,459Million Won▲ +179.0%

Utility service works Value of construction completed

1994 4,466,433Million Won2007 10,197,568Million Won▲ +128.3%

Water supply & sewerages Value of construction completed

1994 672,828Million Won2007 2,727,170Million Won▲ +305.3%

Boring & gronting works Value of construction completed

1994 434,061Million Won2007 867,334Million Won▲ +99.8%

Special Railway Laying Works Value of construction completed

1994 86,378Million Won2007 140,263Million Won▲ +62.4%

Pavement Value of construction completed

1994 365,080Million Won2007 1,365,849Million Won▲ +274.1%

Underwater works Value of construction completed

1994 250,055Million Won2007 735,083Million Won▲ +194.0%

Landscape Planting Works Value of construction completed

1994 235,958Million Won2007 1,804,657Million Won▲ +664.8%

Landscape Works Facility Value of construction completed

1994 113,405Million Won2007 1,118,244Million Won▲ +886.1%

Steel frame works Value of construction completed

1994 319,138Million Won2007 2,513,023Million Won▲ +687.4%

Iron & steel installation Value of construction completed

1994 3,391Million Won2007 230,605Million Won▲ +6700.5%

Cableway installation Value of construction completed

1998 2,103Million Won2007 6,648Million Won▲ +216.1%

Dredging Value of construction completed

1997 126,756Million Won2007 169,191Million Won▲ +33.5%

Total Value of construction completed in original contract

1994 52,960,030Million Won2007 121,741,956Million Won▲ +129.9%

General construction Value of construction completed in original contract

1994 35,589,240Million Won2007 81,613,247Million Won▲ +129.3%

Special construction Value of construction completed in original contract

1994 9,685,506Million Won2007 17,600,060Million Won▲ +81.7%

Interior architecture works Value of construction completed in original contract

1994 1,036,331Million Won2007 3,360,081Million Won▲ +224.2%

Excavating and earthmoving Value of construction completed in original contract

1994 762,433Million Won2007 678,371Million Won▼ −11.0%

Plastering waterproofing masonry construction business Value of construction completed in original contract

1994 727,826Million Won2007 401,541Million Won▼ −44.8%

Stone works Value of construction completed in original contract

1994 82,033Million Won2007 430,454Million Won▲ +424.7%

Painting works Value of construction completed in original contract

1994 310,262Million Won2007 432,501Million Won▲ +39.4%

Scaffolding demolition works Value of construction completed in original contract

1994 688,845Million Won2007 334,937Million Won▼ −51.4%

Metal structure installation and Erection of doors Value of construction completed in original contract

1994 613,439Million Won2007 1,398,990Million Won▲ +128.1%

Roofing sheet metal prefabrication Value of construction completed in original contract

1994 44,898Million Won2007 106,139Million Won▲ +136.4%

Steel Reinforcing and Reinforced Concrete Works Value of construction completed in original contract

1994 1,818,131Million Won2007 1,833,478Million Won▲ +0.8%

Utility service works Value of construction completed in original contract

1994 2,365,701Million Won2007 3,692,616Million Won▲ +56.1%

Water supply & sewerages Value of construction completed in original contract

1994 439,201Million Won2007 1,138,176Million Won▲ +159.1%

Boring & gronting works Value of construction completed in original contract

1994 162,431Million Won2007 170,235Million Won▲ +4.8%

Special Railway Laying Works Value of construction completed in original contract

1994 86,378Million Won2007 107,038Million Won▲ +23.9%

Pavement Value of construction completed in original contract

1994 247,607Million Won2007 509,536Million Won▲ +105.8%

Underwater works Value of construction completed in original contract

1994 25,687Million Won2007 37,830Million Won▲ +47.3%

Landscape Planting Works Value of construction completed in original contract

1994 140,998Million Won2007 525,119Million Won▲ +272.4%

Landscape Works Facility Value of construction completed in original contract

1994 51,513Million Won2007 233,294Million Won▲ +352.9%

Steel frame works Value of construction completed in original contract

1994 53,122Million Won2007 209,766Million Won▲ +294.9%

Iron & steel installation Value of construction completed in original contract

1994 2,751Million Won2007 8,291Million Won▲ +201.4%

Cableway installation Value of construction completed in original contract

1998 1,968Million Won2007 4,828Million Won▲ +145.3%

Dredging Value of construction completed in original contract

1997 88,213Million Won2007 44,054Million Won▼ −50.1%

Total Value of construction completed in subcontract

1994 15,097,072Million Won2007 59,925,068Million Won▲ +296.9%

General construction Value of construction completed in subcontract

1994 923,094Million Won2007 2,466,485Million Won▲ +167.2%

Special construction Value of construction completed in subcontract

1994 13,446,192Million Won2007 51,901,614Million Won▲ +286.0%

Interior architecture works Value of construction completed in subcontract

1994 415,120Million Won2007 4,118,945Million Won▲ +892.2%

Excavating and earthmoving Value of construction completed in subcontract

1994 3,372,147Million Won2007 9,197,685Million Won▲ +172.8%

Plastering waterproofing masonry construction business Value of construction completed in subcontract

1994 880,764Million Won2007 2,509,617Million Won▲ +184.9%

Stone works Value of construction completed in subcontract

1994 350,322Million Won2007 1,522,218Million Won▲ +334.5%

Painting works Value of construction completed in subcontract

1994 255,529Million Won2007 901,586Million Won▲ +252.8%

Scaffolding demolition works Value of construction completed in subcontract

1994 1,182,555Million Won2007 964,638Million Won▼ −18.4%

Metal structure installation and Erection of doors Value of construction completed in subcontract

1994 539,599Million Won2007 4,602,318Million Won▲ +752.9%

Roofing sheet metal prefabrication Value of construction completed in subcontract

1994 221,700Million Won2007 890,531Million Won▲ +301.7%

Steel Reinforcing and Reinforced Concrete Works Value of construction completed in subcontract

1994 2,857,041Million Won2007 11,211,981Million Won▲ +292.4%

Utility service works Value of construction completed in subcontract

1994 2,100,732Million Won2007 6,504,952Million Won▲ +209.7%

Water supply & sewerages Value of construction completed in subcontract

1994 233,626Million Won2007 1,588,993Million Won▲ +580.1%

Boring & gronting works Value of construction completed in subcontract

1994 271,629Million Won2007 697,098Million Won▲ +156.6%

Special Railway Laying Works Value of construction completed in subcontract

1998 2,169Million Won2007 33,224Million Won▲ +1431.8%

Pavement Value of construction completed in subcontract

1994 117,472Million Won2007 856,312Million Won▲ +628.9%

Underwater works Value of construction completed in subcontract

1994 224,368Million Won2007 697,252Million Won▲ +210.8%

Landscape Planting Works Value of construction completed in subcontract

1994 94,960Million Won2007 1,279,538Million Won▲ +1247.4%

Landscape Works Facility Value of construction completed in subcontract

1994 61,892Million Won2007 884,949Million Won▲ +1329.8%

Steel frame works Value of construction completed in subcontract

1994 266,016Million Won2007 2,303,256Million Won▲ +765.8%

Iron & steel installation Value of construction completed in subcontract

1994 640Million Won2007 222,314Million Won▲ +34636.6%

Cableway installation Value of construction completed in subcontract

1998 134Million Won2007 1,819Million Won▲ +1257.5%

Dredging Value of construction completed in subcontract

1997 38,543Million Won2007 125,137Million Won▲ +224.7%

Total Value of carry-over work

1994 89,227,352Million Won2007 340,345,467Million Won▲ +281.4%

General construction Value of carry-over work

1994 76,769,884Million Won2007 285,625,616Million Won▲ +272.1%

Special construction Value of carry-over work

1994 8,404,620Million Won2007 38,305,151Million Won▲ +355.8%

Interior architecture works Value of carry-over work

1994 292,685Million Won2007 2,676,299Million Won▲ +814.4%

Excavating and earthmoving Value of carry-over work

1994 1,913,243Million Won2007 10,089,361Million Won▲ +427.3%

Plastering waterproofing masonry construction business Value of carry-over work

1994 636,518Million Won2007 1,417,831Million Won▲ +122.7%

Stone works Value of carry-over work

1994 157,662Million Won2007 690,973Million Won▲ +338.3%

Painting works Value of carry-over work

1994 114,526Million Won2007 433,151Million Won▲ +278.2%

Scaffolding demolition works Value of carry-over work

1994 541,644Million Won2007 912,844Million Won▲ +68.5%

Metal structure installation and Erection of doors Value of carry-over work

1994 424,762Million Won2007 2,481,303Million Won▲ +484.2%

Roofing sheet metal prefabrication Value of carry-over work

1994 69,495Million Won2007 232,981Million Won▲ +235.2%

Steel Reinforcing and Reinforced Concrete Works Value of carry-over work

1994 1,730,201Million Won2007 8,383,301Million Won▲ +384.5%

Utility service works Value of carry-over work

1994 1,903,293Million Won2007 4,200,610Million Won▲ +120.7%

Water supply & sewerages Value of carry-over work

1994 133,541Million Won2007 1,513,974Million Won▲ +1033.7%

Boring & gronting works Value of carry-over work

1994 119,839Million Won2007 574,526Million Won▲ +379.4%

Special Railway Laying Works Value of carry-over work

1994 34,421Million Won2007 207,485Million Won▲ +502.8%

Pavement Value of carry-over work

1994 53,120Million Won2007 722,416Million Won▲ +1260.0%

Underwater works Value of carry-over work

1994 98,564Million Won2007 587,310Million Won▲ +495.9%

Landscape Planting Works Value of carry-over work

1994 40,788Million Won2007 894,999Million Won▲ +2094.3%

Landscape Works Facility Value of carry-over work

1994 22,963Million Won2007 495,501Million Won▲ +2057.8%

Steel frame works Value of carry-over work

1994 96,820Million Won2007 929,862Million Won▲ +860.4%

Iron & steel installation Value of carry-over work

1994 2,563Million Won2007 314,604Million Won▲ +12174.8%

Cableway installation Value of carry-over work

1998 147Million Won2007 6,799Million Won▲ +4525.2%

Dredging Value of carry-over work

1997 45,390Million Won2007 91,796Million Won▲ +102.2%

Qué es esta estadística

Construction Industry Survey· - 건설업체 → 건설관련기관(6개) → 국가데이터처

Términos clave
원재료비 : 공사시공을 위하여 실제로 투입(사용)된 원재료의 구입 가격에 운임을 포함한 금액원도급업체가 다른 업체와 하도급 계약을 맺을 경우의 원재료비는 ① 원도급업체에서 원재료를 제공하는 조건이면 원도급업체에 계상하고, ② 하도급업체에서 일괄구입 사용하는 조건이면 하도급업체에서 원재료비를 계상보조재료비 : 손익계산서 및 건설원가 명세서상의 소모품비, 사무용품비수선비 : 건설 활동을 위하여 보유하고 있는 유형고정자산의 정상적인 기능유지를 위하여 그 수리를 외부에 의뢰하였을 경우에 지출된 제비용으로서 회계상 경비로 처리된 부분수도광열비 : 조사대상 기간 중 동력 및 자 Leer más

원재료비 : 공사시공을 위하여 실제로 투입(사용)된 원재료의 구입 가격에 운임을 포함한 금액원도급업체가 다른 업체와 하도급 계약을 맺을 경우의 원재료비는 ① 원도급업체에서 원재료를 제공하는 조건이면 원도급업체에 계상하고, ② 하도급업체에서 일괄구입 사용하는 조건이면 하도급업체에서 원재료비를 계상보조재료비 : 손익계산서 및 건설원가 명세서상의 소모품비, 사무용품비수선비 : 건설 활동을 위하여 보유하고 있는 유형고정자산의 정상적인 기능유지를 위하여 그 수리를 외부에 의뢰하였을 경우에 지출된 제비용으로서 회계상 경비로 처리된 부분수도광열비 : 조사대상 기간 중 동력 및 자가 발전용으로 사용한 모든 연료의 사용금액과 전기료, 가스료, 수도료 등을 말함급여총액 : 손익계산서의 판매비와 관리비 중 임원급여, 급료와 임금, 제수당 및 상여금, 잡급과 공사원가명세서의 노무비 중 급여, 임금, 제수당, 기타급여를 포함하며, 해외 건설공사의 경우 현지 고용한 외국인 노무자에 대한 급여는 제외함퇴직급여 : 손익계산서 및 공사원가명세서상의 퇴직급여 및 당년도 퇴직급여충당금전입액이 포함복리후생비 : 종업원에 대한 급여 이외의 위생, 보건, 위안, 요양 등 종업원의 복지와 후생을 위하여 지출한 제비용을 말하는데, 장기 결근자에 대한 급여, 양로연금, 종업원 레크레이션을 위한 운동시설, 영화, 여행, 운동회개최 등을 위한 제비용을 포함대손상각비 : 손익계산서상의 대손상각비로서 외상매출금, 받을 어음 등 채권의 추산액 또는 경상적인 대손상각을 말함임차료 : 건설활동을 위하여 제3자로부터 건물, 장비, 토지 등을 임차하였을 경우 그에 대한 임차료를 말함. 해외건설공사의 경우 외국인으로부터 임차한 대가로 지불한 임차료는 제외세금과공과 : 건설업활동과 관련된 각종 세금 및 공과금으로 등록세, 재산세, 취득세, 사업소득세, 자동차세, 협회비 등 공사원가 및 판매비와 관리비 부문에 포함되는 모든 세금과 공과금을 말한다.해외공사의 경우 외국정부 등에 납부한 조세공과는 제외하였으며 기타영업비용에 포함하였다.감가상각비 : 건물, 건설장비 등의 유형고정자산에 대한 감가상각비와 무형자산에 대한 상각비의 합계를 말함외주공사비 : 다른 업체에 하도급을 주었을 경우 하도급 업체에서 시공한 기성 부분에 대하여 지출하였거나 지출하여야 할 외주공사비를 말하며 연차 공사의 경우에는 조사대상 기간에 지출한 금액 또는 지출하여야 할 금액을 말함기타영업비용 : 상기 언급한 [원재료비, 보조재료비, 수선비, 수도광열비, 급여총액, 퇴직급여, 복리후생비, 임차료, 세금과공과, 감가상각비, 대손상각비, 외주공사비]를 제외한 손익계산서 및 공사원가명세서상의 건설 활동을 위하여 지출한 비용의 합계를 말함. 해외 건설공사의 경우에는 외국인에게 지불한 급여 및 임차료, 외국정부에 지출한 조세공과 등을 기타영업비용에 포함시킴부가가치 : 부가가치는 기업이 산업 활동을 한 결과 생산물의 가치 등에 새로 부가한 가치를 의미하며 이 조사의 부가가치는 다음과 같이 구함부가가치 = 급여총액 + 퇴직급여(퇴직급여충당금전입액 포함) + 복리후생비(보험료 포함) + 임차료 + 세금과공과 + 대손상각비 + 건설영업이익 + 납부부가가치세건설공사내역 : 건설공사내역은 조사기준년도에 이룩한 모든 공사를 건별로 계약액, 당년도 기성액 등을 공사종류별, 발주자별 및 공사 지역별로 구분 조사해외공사의 경우 외환금액은 조사기준연도 12. 31. 기준 외환은행 환율에 의한 환산치임계약종류 : 도급방법에 따라 원도급과 하도급으로 구분 조사하였음. 원도급이란 발주자로부터 1차적으로 도급받은 경우이며, 하도급이란 재도급 또는 하청을 말함이 조사에서는 국내 타 건설 업체로부터 도급받은 경우 하도급으로 간주하였으며 국내 건설회사가 아닌 외국건설 회사나 국내 종합무역상사 등에서 하도급 받은 경우에는 원도급으로 하였음. 또한 건설회사의 자기 건설이나 산하기업, 모기업을 위한 직영공사인 경우 원도급으로 하였음.기성액(공사액) : 기성액(공사액)이라 함은 건설업체에서 공사의 완공여부나 대금의 수취여부 등과는 관계없이 당해년도에 시공한 공사액을 말함. 즉, 공사수주금액 중 공사의 일부를 다른 업체에 하도급(원도급자의 외주공사액)을 준 경우에는 원도급자의 기성액에서 제외하였음당해년도 계약액(수주액) : 조사대상 업체가 발주자 또는 원도급자와 조사기준년도에 체결한 공사 계약액의 합계미기성액 : 조사기준년도에 시공하지 못하고 차년도로 이월된 공사액『당년도계약액 및 이월된 공사액 - 당년도 기성액』= 미기성액발주자 : 발주자라 함은 건설공사를 건설업자에게 도급하는 자를 말함. 다만, 수급인으로서 도급받은 건설공사를 하도급하는 자를 제외함도급 : 도급이라 함은 건설공사를 완성할 것을 약정하고, 상대방이 그 일의 결과에 대하여 대가를 지급할 것을 약정하는 계약원도급공사 : 발주자로부터 직접 건설공사를 완성할 것을 약정한 공사하도급공사 : 발주자로부터 건설공사를 도급받은 건설업자로부터 재 도급받은 건설공사를 말함조직형태 : 경영주체인 각 기업체의 법적 조직형태를 말하며 이 조사에서는 회사법인,회사이외의 법인 및 개인의 세 가지 형태로 구분법인 : 상법, 민법, 특별법에 의하여 설립되고 법인 등기를 완료하여 법인격을 취득하고 있는 기업체기술자, 기술공 : 건설공사의 설계 및 시공에 관한 전반적인 감독업무를 수행할 수 있는 자, 또는 전문직기술자가 지시한 작업내용을 원활하게 응용하여 기술공의 업무를 충분히 수행할 수 있는 자피고용자 : 일정한 산출기준에 의하여 임금, 봉급 또는 이에 준하는 형식의 급여를 받고 그 기업체에 고용되어 있는 모든 남여 종업원을 말하는데, 이에는 상용은 물론 임시 및 일용 종업원도 포함시켰음. 그러나 장기결근자(3개월 이상) 및 군복무자 등은 제외하였고, 해외공사의 경우에는 해외에서 근무하는 우리나라 피고용자만 조사하였고 외국에서 현지 고용한 외국인 피고용자는 제외함개인 : 법인체가 아닌 개인소유의 기업체를 말하는 것으로서 여기서는 법인격이 없는 조합과 같은 임의단체도 포함자 본 금 : 조사기준년도 12.31. 현재로 납입이 완료된 자본금 또는 출자금액종사자수 : 종사자라 함은 그 기업체의 공사현장 혹은 사무실 등을 가리지 않고, 조사대상 기간 중 건설업을 위한 업무에 종사한 피고용자수와 사업주 및 무급가족종사자수의 합계상용종사자 : 1년 이상의 고용계약에 의하여 실제의 취업시간에 관계없이 일정한 정액급여를 받는 종사자사무 및 기타 종업원 : 공사현장업무에는 직접 관여하지 않고 관리직, 전문직, 사무직 업무에 종사하는 자와 이들의 보조원 즉 급사, 사환, 수위, 승용차의 운전사 등을 말함기능공 : 건설공사의 시공에 직접 종사하는 자로서 ① 고등학교 졸업자와 ② 6개월 이상 조직적인 기술습득을 요하는 직종에서 1년 이상 경험을 가진 자, 또는 국가에서 공인하는 동등한 자격을 가진 자로서 통칭 숙련공을 말함임시종사자 : 1년 미만의 고용계약에 의하여 취업일수 및 취업시간에 따라 임금을 받는 잡부,인부,단순노무자 등을 포함한 현장근로 종사자사업주 및 무급가족종사자 : 사업주(출자자포함)와 그의 가족으로서 업체의 운영을 위하여 사무 또는 노무에 통상 작업시간의 ⅓ 이상을 종사하되 일정한 봉급이나 임금을 받지 않은 자를 말함. 사업주의 가족이라도 상시 근무에 종사하고 이에 대한 임금 또는 봉급의 형식으로 급여를 받은 자는 피고용자에 포함연간 급여액 : 조사대상기간에 정기 또는 부정기를 가리지 않고 피고용자에게 노무의 대가로 지급된 모든 현금급여,조사기준년도 이전의 급여로서 체불되었던 것을 조사기준년도 중에 지급한 것은 제외하고, 반면에 조사기준년도 중에 지급하여야 할 급여로서 미지급된 것은 포함매 출 액 : 매출액이라 함은 건설업체에서 당년도에 시공한 공사수익금액과 분양금액 등을 포함함. 미완성공사는 공사가 진행된 정도에 따라 수익이 실현된 것으로 봄.단, 공사수주 금액 중 공사의 일부를 다른 업체에 외주를 준 경우에는 제외(건설비용의 외주공사비로 조사)건설비용 : 1년간의 건설공사에 대하여 발생한 비용의 총계를 말함. 즉 건설공사원가명세서상의 경비와 손익계산서상의 판매비와 관리비를 말하는데, 건설업 이외의 타 산업을 겸하는 기업체는 겸업부문의 비용은 제외

Para qué se elabora
우리나라 건설업부문의 구조 및 산업활동 실태를 파악하여 정책수립에 필요한 기초자료 제공 활용분야 : 건설관련 정책수립, GDP.산업연관표 및 GRDP작성, 월간조사 모집단 자료로 활용
Qué se investiga
기업체

🔴 Esta explicación la redactó el organismo que elabora la estadística. DATA CLOCK KOREA no la ha interpretado ni resumido. El original está en coreano; no lo traducimos, porque hacerlo dejaría de ser lo que el organismo escribió.

Fuente de los datos

Organismo
국가데이터처
Tabla
산업세분류 및 조직형태별 총괄
Proveedor
KOSIS 국가통계포털
Periodo
1994 ~ 2007
Fecha de extracción
2026-08-29
Tratamiento
KOSIS OpenAPI 로 연간 전국값을 받아 그대로 사용. 가공 없음.
Ver los datos originales →

Otras encuestas de esta categoría